Renpu W. Advanced well completion engineering (Waltham, 2011). - ОГЛАВЛЕНИЕ / CONTENTS
Навигация

Архив выставки новых поступлений | Отечественные поступления | Иностранные поступления | Сиглы
ОбложкаRenpu W. Advanced well completion engineering. - 3rd ed. - Waltham: Gulf Professional Pub., 2011. - xx, 715 p.: ill. - Bibliogr. at the end of the chapters. - Ind.: p.701-715. - ISBN 978-0-12-3858689
 

Оглавление / Contents
 
   Foreword .................................................... ix
   Preface to the Third Edition ................................ xi
   About the Author .......................................... xiii
   Introduction ................................................ xv
1  Basis of Well Completion Engineering ......................... 1
   1.1  Grounds of Reservoir Geology and Reservoir
        Engineering ............................................. 3
   1.2  Core Analysis Techniques ............................... 13
   1.3  Reservoir Sensitivity to Fluid and Working Fluid
        Damage Evaluation ...................................... 22
   1.4  Reservoir Stress Sensitivity Analysis .................. 41
   1.5  In Situ Stress and Mechanical Parameters of Rock ....... 54
   1.6  Technological Grounds of Petroleum Production
        Engineering ............................................ 67
2  Well Completion Mode Selection .............................. 75
   2.1   Vertical, Slant, and Directional Well Completion ...... 76
3  Selection and Determination of Tubing and Production
   Casing Sizes ............................................... 117
   3.1  Overview .............................................. 118
   3.2  Overview of Nodal Analysis ............................ 119
   3.3  Selection and Determination of Tubing and Production
        Casing Sizes for Flowing Wells ........................ 121
   3.4  Selection and Determination of Tubing and Production
        Casing Sizes for Gas Wells ............................ 130
   3.5  Selection and Determination of Tubing and Production
        Casing Sizes for Artificial Lift Wells ................ 136
   3.6  Effects of Stimulation on Tubing and Production
        Casing Size Selection ................................. 156
   3.7  Selection and Determination of Tubing and Production
        Casing Sizes for Heavy Oil and High Pour-Point Oil
        Production Wells ...................................... 161
4  Completion and Perforating Fluids .......................... 171
   4.1  Functions of Drilling and Completion Fluid and Basic
        Requirements .......................................... 172
   4.2  Drilling and Completion Fluid Systems and
        Application ........................................... 175
   4.3  Shield-Type Temporary Plugging Technique .............. 185
   4.4  Drilling and Completion Fluid for a Complicated
        Reservoir ............................................. 203
   4.5  Perforating Fluid ..................................... 210
5  Production Casing and Cementing ............................ 221
   5.1  Basic Requirements for Production Casing Design and
        Integrity Management of Production Casing ............. 223
   5.2  Hole Structure and Types of Casing .................... 231
   5.3  Strength of Casing and Strength Design of Casing
        String ................................................ 242
   5.4  Cementing ............................................. 256
   5.5  Production Casing and Cementing for Complex Type
        Wells ................................................. 272
6  Perforating ................................................ 295
   6.1  Perforating Technology ................................ 297
   6.2  Perforated Well Productivity Influencing Rule
        Analysis .............................................. 315
   6.3  Perforating Differential Pressure Design .............. 337
   6.4  Optimizing the Perforation Design ..................... 346
7  Well Completion Formation Damage Evaluation ................ 364
   7.1  Overview .............................................. 365
   7.2  Principle of Formation Damage Evaluation by Well
        Testing ............................................... 369
   7.3  Formation Damage Diagnosis of Homogeneous Reservoir
        by Graphic Characteristics ............................ 373
   7.4  Graphic Characteristics of a Dual Porosity Reservoir
        and a Reservoir with a Hydraulically Created
        Fracture .............................................. 383
   7.5  Distinguishing Effectiveness of Stimulation by
        Graphic Characteristics ............................... 397
   7.6  Quantitative Interpretation of Degree of Formation
        Damage ................................................ 403
   7.7  Well Logging Evaluation of Formation Damage Depth ..... 413
8  Measures for Putting a Well into Production ................ 417
   8.1  Preparations before Putting a Well into Production .... 418
   8.2  Main Measures for Putting the Well into Production .... 423
   8.3  Physical and Chemical Blocking Removal ................ 425
   8.4  Hydraulic Fracturing for Putting a Well into
        Production ............................................ 445
   8.5  Acidizing for Putting a Well into Production .......... 470
   8.6  High-Energy Gas Fracturing for Putting a Well into
        Production ............................................ 495
   8.7  Flowing Back .......................................... 512
9  Well Completion Tubing String .............................. 524
   9.1  Oil Well Completion Tubing String ..................... 525
   9.2  Gas Well Completion Tubing String ..................... 537
   9.3  Separate-Layer Water Injection String ................. 544
   9.4  Heavy Oil Production Tubing String .................... 547
   9.5  Completion Tubing String Safety System ................ 553
   9.6  Tubing String Mechanics ............................... 562
10 Wellhead Assembly .......................................... 572
   10.1 Oil-Well Christmas Tree and Tubinghead ................ 574
   10.2 Gas-Well Christmas Tree and Tubinghead ................ 587
   10.3 Water Injection and Thermal Production Wellhead
        Assembly .............................................. 596
   10.4 Common Components of a Wellhead Assembly .............. 601
11 Oil and Gas Well Corrosion and Corrosion Prevention ........ 617
   11.1 Related Calculation of Oil and Gas Well Corrosion ..... 619
   11.2 Oil and Gas Well Corrosion Mechanisms and
        Classification ........................................ 624
   11.3 Material Selection for Corrosive Environment of Oil
        and Gas Wells ......................................... 640
   11.4 Oil and Gas Well Corrosion Prevention Design .......... 655
   11.5 Tubing and Casing Corrosion Prevention for Sour Gas
        Reservoirs ............................................ 672

   Index ...................................................... 701


Архив выставки новых поступлений | Отечественные поступления | Иностранные поступления | Сиглы
 

[О библиотеке | Академгородок | Новости | Выставки | Ресурсы | Библиография | Партнеры | ИнфоЛоция | Поиск]
  © 1997–2024 Отделение ГПНТБ СО РАН  

Документ изменен: Wed Feb 27 14:24:14 2019. Размер: 10,357 bytes.
Посещение N 1410 c 06.11.2012